English / Albania

Solar Panel Installation in Albania

LiraElectric is a full-service solar installer based in Shkodër, Albania, working with expats, embassies, NGOs, and businesses across Tirana, Durrës, Vlorë and the entire country. We design, supply and install turn-key photovoltaic systems with Tier-1 LONGi panels and Huawei inverters — backed by a 30-year manufacturer warranty. English-language consultation, contracts and support included.

🇦🇱 Albanian version: View in Shqip

Why LiraElectric

Tier-1 LONGi Hi-MO X10 Panels

World's #1 panel manufacturer. Up to 24.1% efficiency, 30-year linear power warranty.

Huawei SUN2000 Inverters

Smart inverters with real-time monitoring via app, 10-year warranty (extendable to 25).

Turn-Key Installation

Design, supply, mounting, OSHEE grid connection — one team handles everything in Albania.

Local Office in Shkodër

Physical showroom on Bulevardi Zogu I — visit us, see the equipment, talk to our engineers.

English-Speaking Engineers

Full project consultation, contracts, and after-sales support available in English.

Transparent Pricing in EUR

Quotes in EUR or ALL. No hidden fees. From €430/kW for systems above 41 kWp.

Frequently Asked

How much does solar panel installation cost in Albania?+

Turn-key prices start at ~€880/kW for systems up to 8 kWp and drop to ~€430/kW for systems above 41 kWp. A typical 5 kWp residential system costs around €4,400–€4,650, and a 10 kWp system around €7,800–€8,300. Prices include design, panels, inverter, mounting, cabling, installation, and OSHEE grid-connection paperwork.

Do you serve foreign residents and expats in Albania?+

Yes. We regularly work with expats, embassy staff, NGO workers, digital nomads, and foreign-owned businesses across Albania. All consultations, quotes, and contracts are available in English. Payment can be made in EUR or ALL via bank transfer.

How long does installation take?+

A residential 5–10 kWp system is typically installed in 1–2 days. Net-metering registration with OSHEE (the national grid operator) takes an additional 30–45 days, after which your system officially exports surplus energy to the grid.

What is net metering in Albania and how does it work?+

Net metering allows you to feed surplus solar electricity back to the OSHEE grid at the same rate you buy it (11.4 ALL/kWh residential, 16.4 ALL/kWh commercial). At year-end, the grid effectively becomes a free battery — you only pay for net consumption.

What warranty do you provide?+

LONGi Hi-MO X10 panels: 30 years linear power warranty. Huawei inverters: 10 years (extendable to 25). Mounting structures: 15 years. Workmanship: 2-year warranty from LiraElectric.

Can I buy panels without installation?+

Yes — we sell LONGi panels, Huawei inverters, mounting hardware, and BOS components separately to qualified installers and DIY customers. Wholesale pricing available for bulk orders.

Do you install on coastal villas (Vlorë, Sarandë, Durrës)?+

Absolutely. We install across Albania's coastline, using marine-grade aluminum structures and IP68-rated connectors to handle salt-air corrosion. Many of our clients are British, German, and Italian villa owners.

Will solar work during Albania's hot summers?+

Yes — Albania receives ~2,500 sun hours per year, one of the highest in Europe. Modern LONGi panels include temperature-coefficient optimization, so they continue producing efficiently even at 35–40 °C ambient temperatures.

How do I get a quote?+

Send us a WhatsApp message at +355 69 569 4851 with your address and recent electricity bill (kWh/month). We'll reply within 24 hours with a personalized quote in EUR, including ROI projections.

Ready to go solar?

Free consultation & quote. We respond within 24 hours.

Call / WhatsApp: +355 69 569 4851